Abu Dhabi, UAE

SAADIYAT BEACH VILLAS

media
media

Description

The Saadiyat project comprises of 354 luxury villas utilizing global standard master planning, cutting-edge design, and modern facilities designed with a sustainable development mandate.


Scope of Work: Supply, Installation, Testing, Commissioning, and Maintenance.


AIR-CONDITIONING AND VENTILATION SYSTEM

• 2,600 Nos. Ducted split units (Indoor and Outdoor)

• 170 Nos. Package unit.

• 354 Nos. Cassette type.


PLUMBING WORK

• 354 Nos. GPR tanks.

• 354 Nos. automatic filtration systems.

• UPVC pipes for drainage systems.

• PPR pipes for hot and cold water.

• Electrical water heaters.

• 354 Nos. water meters and related accessories.

• High quality sanitary fixtures with accessories.


ELECTRICAL WORK

• Power system with a total 56MW connected load.

• 3870 Nos. main, sub-main & final distribution boards.

• Special earthing system that achieves ADWEA requirements.

• Structure cabling system (Voice/Data), consisting of patch panel, and fiber optic cables as per Etisalat requirements.

• Video intercom, garage control, motion detectors, automatic dimming, entrance video camera, music system.


LPG SYSTEMS

• Supply and installation of central gas system.

• Main control panel and gas meter.

• 492Nos. Gas cooker outlets for kitchens and external grills.

• Gas detection system including central panels interlocking with fire alarm and fire fighting systems.

• Control valves and gas detection systems.

Information About the Project

Location Abu Dhabi, UAE
Client TDIC
Total BUA -

Are You Going to Implement Project?