Dubai, UAE

SHOOTING CLUB

media
media

Description

The Shooting club project comprises of 8 residential buildings of 8 floors each plus a community centre utilizing global standard master planning, cutting-edge design, and modern facilities designed with a sustainable development mandate.


Scope of Work: Supply, Installation, Testing, Commissioning, and Maintenance.


AIR-CONDITIONING AND VENTILATION SYSTEM

• 1768 Nos. fan coil units.

• 14 Nos. heat exchangers.

• 44 Nos. close control units

• 7 sets of chilled water pumps.

• 21 Nos. of FAHU’s.


PLUMBING WORK

• 13 Nos. GPR tanks.

• UPVC pipes for drainage systems.

• PPR and pex pipes for hot and cold water.

• Electrical water heaters.

• 430 Nos. water meters and related accessories.

• High quality sanitary fixtures with accessories.

• Booster, transfer and circulation pump sets.


FIRE-FIGHTING SYSTEM

• 1 set of pumps (Diesel, Electrical, and jockey)

• Fire sprinklers for all buildings.

• Breaching Inlets.


ELECTRICAL WORK

• Power system with a total 23 MW connected load.

• 650 Nos. main, sub-main & final distribution boards.

• Special earthing system that achieves ADWEA requirements.

• Structure cabling system (Voice/Data), consisting of patch panel, and fiber optic cables as per Etisalat requirements.

• Video intercom, garage control, motion detectors, automatic dimming, entrance video camera, music system.

• CCTV, CO system, Public address system, SMATV, Ups, Light control, lightning protection, fire alarm, gate barriers.

• Building Management System.


LPG SYSTEMS

• Supply and installation of central gas system.

• Main control panel and gas meter.

• 430 Nos. Gas cooker outlets for kitchens and external grills.

• Gas detection system including central panels interlocking with fire alarm and fire fighting systems.

• Control valves and gas detection systems.

Information About the Project

Location Dubai, UAE
Client PRIVATE PROPERTY MANAGEMENT
Total BUA -

Are You Going to Implement Project?